We are design and construction experts.
The projects featured on our website are great illustrations of a typical success with multiple moving parts, such as one project with architectural design, engineering, construction, project management, and more.
If you have questions about a specific project or want to get started on pricing a project right away give us a call at (602) 989-2433 or contact us on our Contact page.
Recent projects across Arizona
Summit Academy Weatherization
Mesa Public Schools
Mesa, Arizona
This project consisted of a dual campus restoration projects in two phases. General renovations of the campus including new weatherproof coatings, building sealants, restoration of exterior doors, and roofing systems.
Atkinson Elementary School Roof Improvement
Cartwright Elementary School District
Phoenix, Arizona
This project was a complete roof system replacement. Project scope also included weatherproofing of the parapet walls and installation of new mechanical curbs.
Irene Lope Elementary School Weatherization
Roosevelt Elementary School District
Phoenix, Arizona
This project consisted of general renovations of the campus including new weather-proof coatings, building sealants, restoration of exterior, doors, and roofing systems.
Solomon Elementary School Campus Improvements
Solomon Elementary School District
Solomon, Arizona
This project consisted of a large renovation project including recoating the exterior walls, replacing the building sealants, application of restorative roof systems, structural roof truss stiffening, structural coatings, modified masonry repairs, HVAC systems, and site grading.
Lake Havasu High School Exterior Façade Restoration
Lake Havasu Unified School District
Lake Havasu City, Arizona
This project consisted of repair, restore and weather-proof several different campus exterior wall systems including but not limited to pointing the brick and masonry mortar joints, replacing all expansion joint sealants, fenestration assembly sealants, and applying elastomeric and translucent wall coatings and sealers.
Page High School Roof Improvements
Page Unified School District
Page, Arizona
This project consisted of replacing all existing low-slope roof systems and weatherproofing the parapet walls with new metal coping flashing and elastomeric coating.
Fredonia-Moccasin High School Weatherization
Fredonia-Moccasin Unified School District
Fredonia, Arizona
This project consisted of replacing all the asphalt shingle and low-slope single-ply roof systems, replacing all expansion joint and building sealants, plus stucco repairs, new metal, and stucco elastomeric wall coatings.
Prescott High School Roof Improvements
Prescott Unified School District
Prescott, Arizona
This project consisted of replacing the large built-up-roof system with a new modified bituminous low-slope roof system including raising the mechanical units.
NEW DESIGNS
• ASU Baseball Pitching Laboratory (ASU)
• Ehrenburg Elementary School (Quartzite ESD)
• Westview High School (Tolleson UHSD)
PROTOTYPE DESIGNS
• GE Silicone Translucent Coatings (Mesa Public Schools)
ADDITIONS/RENOVATIONS
• Westwood High School CampusRenovation (Mesa Public Schools)
• Thatcher High School Campus Renovation (Thatcher USD)
• Liberty Elementary School Campus Renovation (Liberty ESD)
Design + Build
Our team has a deep knowledge base of the state grant system that allows state entities the opportunity to seek state funding to maintain and rehabilitate their buildings.
RTC has provided new designs, prototype designs, additions/renovations, remodels, system analysis, and bond program development to several clients across the state of Arizona and the southwest.
REMODELS
• Curiel Elementary School
• Show Low High School
• Snowflake Highland Primary Elementary School
SYSTEM ANALYSIS
• Pima Elementary School–Building Due Diligence Analysis
• Quartzite Elementary School–Building Due Diligence Analysis
• Double Adobe Elementary School–Construction Forensic Analysis
BOND PROGRAM DEVELOPMENT
• Paradise Valley Unified School District
• Mesa Public Schools